• Canada Barriere Project: 5.5km×4km ore body, low-carbon tech enabled production within 2 years. 加拿大巴里尔铁矿-钒矿项目:5.5km×4km矿体,采用低碳技术,2年内投产。

• USA Ares Project: Dry processing achieved 90% water savings and high-purity fluorite output. 美国Ares萤石矿项目:干法选矿系统节水90%,并实现高纯度萤石生产。

image